Vogelzang TR002B User Manual Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 5
ASSEMBLY INSTRUCTIONS
TOOLS AND MATERIALS REQUIRED
FOR INSTALLATION
TOOLS
• Pencil
6 foot Folding Rule or Tape Measure
Tin Snips
Drill: Hand or Electric
1/8˝ dia. Drill Bit (for sheet metal screws)
Screwdrivers (blade and Phillips type)
10mm Nut Driver or Ratchet with 10mm Socket
Safety Glasses
Gloves
11/16 Socket or Wrench
MATERIALS
(NOTE: The following items are NOT included with your stove)
Flooring Protection: as specified (see page 7)
Chimney Connection: dia. minimum 24 MSG black or 26 MSG
blue steel straight stove pipe or elbow(s) as required.
1/2˝ Sheet Metal Screws
Chimney: Existing Code-approved Lined Masonry Chimney
or Inside Dia. UL 103 HT (US)/ULC-S629 (CDN) listed
manufactured chimney.
Furnace Cement (manufacturer recommends Rutland Code 78
or equivalent)
CAUTION: STOVE IS HEAVY. MAKE SURE YOU
HAVE ADEQUATE HELP AND USE PROPER
LIFTING TECHNIQUES WHENEVER MOVING
STOVE.
1. Uncrate the stove and remove all cardboard and
styrofoam packing materials and protective poly
bag. Remove pedestal base, sides, front, top, ash-
drawer and ash drawer support from the carton.
(Save packing materials for further assembly.)
NOTICE: DO NOT remove ceramic blanket
material from inside stove pipe opening (Fig. 1).
This blanket provides an air seal on the side walls
of the stove to direct combustion gasses over the
secondary combustion tubes before exiting via the
4. Attach the pedestal front frame to the sides. The
pedestal front should go over (not inside of) the side
panels. Use three (3) self-tapping screws (provided
in the hardware pack) on each side to attach both
pedestal sides to the pedestal front (figure 4).
5. Position ash drawer support into assembled ped-
estal (Figure 5) and secure from rear with two (2)
machine screws, lockwashers and hex nuts. Tighten
all pedestal hardware.
6. Position the pedestal top with the large vent hole
positioned toward the front and attach with six (6)
chimney. DO NOT REMOVE the ceramic blanket
or your stove will not operate properly.
Figure 2 – Pedestal
Assembly Hardware:
sheet metal screws, 5/16˝
machine screw, lock
washer & hex nuts
Figure 3 –
Assemble
sides to base
Figure 4 –
Attach Pedestal
Front Frame to Sides.
(Note– front goes OVER
the side panels.)
Figure 1 – DO NOT remove ceramic blanket from
inside stove pipe opening. This is NOT packing
material but an integral component of the stove
combustion system.
NOTICE: Vogelzang International Corp. grants no warranty, stated or implied, for the installation or maintenance
of your wood stove and assumes no responsibility of any incidental or consequential damages.
2. Remove parts and hardware pack located inside
firebox.
3. Align the hole pattern of one of the pedestal sides
to the holes in the base and secure with four (4)
machine screws, lock washers and hex nuts. As-
semble the opposite side to the base. (Note: Sides
are interchangeable)
continued on next page
DO NOT
REMOVE!
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 25 26

Comments to this Manuals

No comments