Vogelzang TR002B User Manual Page 1

Browse online or download User Manual for Kiln Vogelzang TR002B. Vogelzang TR002B User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 1
Vogelzang International Corporation
400 West 17th Street
Holland, Michigan 49423
www.vogelzang.com
Phone: 1-616-396-1911
Fax: 1-616-396-1971
THE SHILOH
HIGH-EFFICIENCY WOODSTOVE
EPA Certified (4.22 grams/hr)
Model TR002B Owners Manual
(Save These Instructions)
Le manuel de langue français est disponible à www.vogelzang.com
French language manual is available at www.vogelzang.com
Report No. 235-S-01c-2
READ ALL INSTRUCTIONS CAREFULLY
BEFORE INSTALLING OR OPERATING
THIS STOVE. FAILURE TO FOLLOW INSTRUC-
TIONS MAY RESULT IN PROPERTY DAMAGE,
BODILY INJURY, OR EVEN DEATH.
NOTE: IT IS RECOMMENDED INSTALLATION
BE COMPLETED BY A QUALIFIED HEATING
EQUIPMENT INSTALLER!
DO NOT INSTALL IN A MOBILE HOME.
REFER TO MARKINGS ON STOVE LABELS FOR
ADDITIONAL INFORMATION.
This stove meets test standards:
US: UL 1482-2010 & CDN: ULC-S627-00
SAFETY NOTICE: IF THIS STOVE IS NOT PROPERLY INSTALLED, A HOUSE/BUILDING FIRE MAY
RESULT. FOR YOUR SAFETY, CONTACT LOCAL OR MUNICIPAL BUILDING OR FIRE OFFICIALS
ABOUT PERMITS, RESTRICTIONS, AND INSTALLATION REQUIREMENTS FOR YOUR AREA.
Page view 0
1 2 3 4 5 6 ... 25 26

Summary of Contents

Page 1 - HIGH-EFFICIENCY WOODSTOVE

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 1Vogelzang International Corporation400 West 17th StreetHolland, Michigan 49423www.vogelzang.co

Page 2

Page 10 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0Connector pipe is used to make the connection from the final positioning of your

Page 3

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 11CHIMNEY SIZINGToday’s solid fuel heating appliances are much more efficient than those made in

Page 4 - TABLE OF CONTENTS

Page 12 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0CHIMNEY CONNECTIONSFig. 17 - Chimney Construction Through RoofIf the connector s

Page 5 - ASSEMBLY INSTRUCTIONS

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 13Fig. 18 - Chimney Connection to Firebox Through Masonry WallCHIMNEY CONNECTIONS continued …c

Page 6

Page 14 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0CHIMNEY CONNECTIONS continued …least 8˝/203mm of liner must remain below the ent

Page 7 - LOCATING STOVE

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 15A. Brick Masonry Minimum 3.5˝/89mm thick brick masonry all framed into combustible wall wit

Page 8

Page 16 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0THIS STOVE IS DESIGNED TO BURN WOOD FUEL ONLY!Hardwood, 16˝/41cm to 18˝/46cm mus

Page 9 - INSTALLATION INSTRUCTIONS

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 17content. Some experimentation will initially be required to find that “sweet spot” where your

Page 10 - CONNECTOR PIPE INSTALLATION

Page 18 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.02. When adding fuel be careful not to hit or bump the ceramic baffle board locat

Page 11 - CHIMNEY CONNECTIONS

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 195. Do not attempt to extend the burn time by using wet wood. Not only does burning wet woo

Page 12

Page 2 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0SAFETY INSTRUCTIONS-Read All Instructions Carefully.1. The installation of this

Page 13 - FIREPLACE INSTALLATION

Page 20 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0to warm than manufactured chimneys on account of their greater structural mass.

Page 14

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 21WIRING DIAGRAM - MODEL F-6 BLOWER OPTIONDOOR GASKET REPLACEMENT CAUTION: DO NOT OPERATE A STO

Page 15 - B. Insulated Sleeve

Page 22 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0ORDERING PARTS - TROO2B SHILOH™ STOVEWhen ordering missing or replacement parts,

Page 16 - OPERATING INSTRUCTIONS

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 23PARTS - TR001B DEFENDER HIGH-EFFICIENCY STOVEWhen ordering missing or replacement parts, alwa

Page 17 - OPERATING continued …

Page 24 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0FLOOR PROTECTOR MATERIAL CALCULATIONSThis stove has been tested for and must be

Page 18 - PREVENTING CREOSOTE BUILDUP

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 25CHIMNEY & STOVE MAINTENANCE LOG DATE OF SERVICE PERFORMED BY DESCRIPTION

Page 19 - SERVICE HINTS continued . .

Page 26 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0Vogelzang International Corporation400 West 17th StreetHolland, Michigan 49423ww

Page 20 - SERVICE HINTS continued …

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 3ing during the first 12 to 15 fires. Additional smoke and odor may be emitted from the light oil

Page 21

Page 4 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0TABLE OF CONTENTSSAFETY PRECAUTIONS ...

Page 22

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 5ASSEMBLY INSTRUCTIONSTOOLS AND MATERIALS REQUIRED FOR INSTALLATION TOOLS• Pencil• 6 foot

Page 23

Page 6 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0Figure 6 – Attach Pedestal Top.(Note– Position vent orifice towards front.)Figure

Page 24

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 7Fig. 10 – Top View Minimum Clearance Dimensions from Combustible Surfaces1. The stove must b

Page 25

Page 8 | SHILOH™ Vogelzang International Corp. TR002B | 20120125.0LOCATING STOVE Failure to follow these minimum clearance require-ments may resul

Page 26 - Steve Vogelzang

TR002B | 20120125.0 www.vogelzang.com SHILOH™ | Page 9FIREBRICK ASSEMBLYFirebrick extends the life of your stove and radiates heat more evenly. Chec

Comments to this Manuals

No comments